Kirra provides real-time blast statistics and Voronoi analysis to help you verify your design before export.
Screenshot coming soon – statistics panel and Voronoi overlay
The Blast Statistics panel displays a live summary of your blast design. It updates automatically whenever holes are added, deleted, moved, or edited.
| Statistic | Description |
|---|---|
| Total Holes | Count of all holes in the project |
| Charged Holes | Holes with a charge design assigned |
| Uncharged Holes | Holes with no charge design |
| Pattern Area | Convex hull area of all collar positions (m2) |
| Average Burden | Mean distance between rows (m) |
| Average Spacing | Mean distance between holes within rows (m) |
| B/S Ratio | Burden-to-spacing ratio |
| Statistic | Description |
|---|---|
| Total Drill Metres | Sum of planned depths across all holes |
| Average Depth | Mean hole depth (m) |
| Min / Max Depth | Shallowest and deepest holes |
| Average Diameter | Mean hole diameter (mm) |
| Total Subdrill | Sum of subdrill across all holes (m) |
| Statistic | Description |
|---|---|
| Total Explosive Mass | Sum of all explosive deck masses (kg and tonnes) |
| Average Charge per Hole | Mean explosive mass per hole (kg) |
| Total Stemming | Sum of stemming lengths (m) |
| Average Stemming Length | Mean stemming per hole (m) |
| Powder Factor (kg/t) | Explosive mass per tonne of rock (requires Voronoi volume) |
| Powder Factor (kg/m3) | Explosive mass per cubic metre of rock (requires Voronoi volume) |
| Products Breakdown | Table showing total mass by explosive product type |
| Statistic | Description |
|---|---|
| Total Initiation Time | Time from first to last hole firing (ms) |
| Average Inter-hole Delay | Mean delay between sequential holes (ms) |
| Unassigned Holes | Holes with no delay value |
| Duplicate Delays | Holes sharing identical firing times |
| Min / Max Delay | Earliest and latest firing times (ms) |
Voronoi diagrams partition space into cells – one per hole – where each cell contains all points closer to that hole than any other. This enables per-hole rock volume and powder factor calculations.
Open the Voronoi overlay from the Analysis section of the toolbar. All holes must have bench height set for volume calculations to work.